The Schreiber system replaces the aerator and previous air diffusion. New Aeration allowed for improved plant performance and no splasher aerator and misting. The constant noise of the splashing aerator will not be missed by the operators. Ahh, peace and quiet!!
By replacing the previous equipment in three days, the design and performance has meet expectations. Our plant has increased capacity and our system will have lower O&M costs. Also, we do not have wastewater sewage mist on our vehicles and operations building.
Improved air pattern increase mixing and DO control in the basin.
Our engineer has a video of the installation. Contact Jay Updike at 918 682 7811.