Parsons KS WWTP Expansion
PROJECT TIMING:
Summer 2004 Start Const
Startup August 23, 2005
Construction Bid: $4.3 million by LaForge & Budd
Engineering Costs approx: $400,000
CONSTRUCTION BID/GALLON
$1.76
50 Year Old Trickling filter taken out of service
Rotating Bridge with diffusers operational
Panelview Plus illustration on aeration basins
6 mm Opening Screen with Washer Compactor
Vortex Grit Chamber
Influent VFD Pump Station
Peak Flow Peakflow bypass actuated gate
Schreiber Fine Screen -
Schreiber Washer/Compactor
EnviroDyne Vortex Grit Chamber
Grit Chamber Classifier discharge
Panelview Plus Control Screens
EFFLUENT WATER QUALITY AND CASCADE AERATION
MCC ROOM AND SCADA SYSTEM CONTROLS
REMOTE PANELS FOR LOCAL I/O
Analog and Digital inputs
Located as follows:
CP-2 Lower level in main building
CP-3 Sludge Digestion Area
CP-4 Influent Lift Station Area
New Plant in "background" with old trickling filter plant used as peak flow basin design and aerobic sludge digestion
WEDECO UV Disinfection -
SELF CLEANING LAMP SLEEVES
Blue Panels - Ballast Enclosures
Channel:
- Two channels with two banks/channel
Gates:
- Each channel has control gate